夜夜操夜夜爽,九九热在线免费观看,99热精品在线播放,国内日本精品视频在线观看,国产精品极品美女自在线看免费一区二区,欧美精品久久,国产亚洲精品不卡在线

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

After Services
Location:Home → Services → After Services

Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "since the date of the sale of the machine within 12 months" or "the machine is running 2400 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "third strong security, "loader running 1200 hours, or 5-6 months;" fourth strong guarantee "loader running 1800 hours, or 8-9 months;" fifth strong protection ", loaders run 2400 hours, or 11-12 months.

Excavator
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the excavator, "since the date of the sale of the machine within 12 months" or "length of time the machine is running 2000 hours of" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong security," excavator run about 100 hours or 10 days; "second strong security," excavator 500 hours or 2-3 months; "third strong security, "excavator running 1000 hours, or 5-6 months;" fourth strong security, "excavator running 1500 hours, or 8-9 months;" fifth strong security, "excavator operation 2000 hours, or 11-12 months.

Block Handling Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "from the date of sale of machines within six months" or "the machine is running 1200 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform three mandatory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "section three strong security, "loader running 1200 hours, or 5-6 months.


About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
克山县| 揭阳市| 南和县| 出国| 济南市| 太谷县| 恩施市| 尚义县| 盐津县| 宁陕县| 崇明县| 泸水县| 开封市| 惠州市| 昌平区| 依兰县| 济源市| 五常市| 杭锦后旗| 新田县| 濮阳市| 汪清县| 顺义区| 尤溪县| 襄汾县| 阳东县| 米泉市| 肥西县| 万载县| 郧西县| 拉萨市| 霸州市| 皮山县| 斗六市| 龙门县| 长阳| 仁寿县| 临颍县| 应城市| 山丹县| 泗水县|