夜夜操夜夜爽,九九热在线免费观看,99热精品在线播放,国内日本精品视频在线观看,国产精品极品美女自在线看免费一区二区,欧美精品久久,国产亚洲精品不卡在线

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

After Services
Location:Home → Services → After Services

Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "since the date of the sale of the machine within 12 months" or "the machine is running 2400 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "third strong security, "loader running 1200 hours, or 5-6 months;" fourth strong guarantee "loader running 1800 hours, or 8-9 months;" fifth strong protection ", loaders run 2400 hours, or 11-12 months.

Excavator
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the excavator, "since the date of the sale of the machine within 12 months" or "length of time the machine is running 2000 hours of" (in both cases in order to guarantee the arrival time of the first period ) to perform five compulsory maintenance, specific time: "The first strong security," excavator run about 100 hours or 10 days; "second strong security," excavator 500 hours or 2-3 months; "third strong security, "excavator running 1000 hours, or 5-6 months;" fourth strong security, "excavator running 1500 hours, or 8-9 months;" fifth strong security, "excavator operation 2000 hours, or 11-12 months.

Block Handling Wheel Loader
To provide users with on-site services to help users conduct a comprehensive inspection and maintenance of the loader, "from the date of sale of machines within six months" or "the machine is running 1200 hours long" (in both cases in order to guarantee the arrival time of the first period ) to perform three mandatory maintenance, specific time: "The first strong protection", loaders run about 100 hours or 10 days; "second strong protection", loaders run 600 hours or 2-3 months; "section three strong security, "loader running 1200 hours, or 5-6 months.


About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
彭水| 莲花县| 渭南市| 耒阳市| 郯城县| 佛冈县| 镶黄旗| 千阳县| 垦利县| 日土县| 长汀县| 贵州省| 高台县| 琼结县| 北宁市| 彰化市| 子洲县| 合川市| 平和县| 鄂伦春自治旗| 通辽市| 那曲县| 余干县| 广水市| 涿州市| 井陉县| 措美县| 武功县| 黄冈市| 乌苏市| 屏东市| 绥宁县| 嘉定区| 吉木萨尔县| 福泉市| 广宁县| 利川市| 邳州市| 宾川县| 临湘市| 清水县|